Inspections (New)  - 100%
During the 100% Construction Inspection, also referred to as the Final Inspection, all work should be completed and must comply with the approved plan. Approved plans must be on-site at all times during the construction process.
Checklist Items for This Phase:
- Address readily visible from the street
 
- Electrical panel labeled
 
- Emergency lights operational
 
- Exit signs in place and operational
 
- Exits clear and accessible
 
- Fire extinguishers tagged and mounted
 
- Lockbox installed and proper keys provided
 
- Door hardware of correct type and operational
 
- Cover plates on all outlets and switches
 
- Fire lane signage and striping in place as required
 
- FDC signage in place
 
- Acceptance testing of fire protection systems if so equipped:
 
- Sprinkler System
 
- Fire Alarm System
 
- Kitchen Hood and Suppression System
 
- Paint Booth
 
All building and fire prevention permit inspections are scheduled through the CityView portal.